Harrison Roof AtelierCall about roof installation 877-702-1610

Assembly detail · Harrison, New York

Roof Flashing Plan

Inventory valleys, walls, chimneys, edges, and penetrations.

Atelier note

The Roof Flashing Plan proposal needs five separate entries, not one product label. The entries are eaves, rakes, and valleys; walls, dormers, and step flashing; chimney and masonry intersections; pipes, skylights, and curbs; existing metal reuse or reconstruction. Compare them before approving an order or installation date. Stay on the ground or in a safely accessible interior area. Roof access, destructive inspection, and installation belong with qualified people using proper protection.

Call about roof installation 877-702-1610

Planning factors

Five decisions worth documenting

Use the headings as a proposal check. The actions beneath them are specific to this project decision.

01

Eaves, rakes, and valleys

List every eave, rake, valley, and drainage change on the roof plan. Ask which metal is new, which is retained, and what supports retaining an existing piece.

02

Walls, dormers, and step flashing

Wall and dormer intersections may need step flashing, counterflashing, and coordinated siding work. Identify who opens and restores the adjacent surface.

03

Chimney and masonry intersections

A chimney can involve roofing and masonry responsibilities. Agree on the flashing detail, masonry condition, and specialist handoff before either trade starts.

04

Pipes, skylights, and curbs

Inventory pipes, skylights, hatches, and equipment curbs by location. Each needs a compatible detail rather than one blanket line saying all penetrations are sealed.

05

Existing metal reuse or reconstruction

Request photos while the layers and connections are visible. Sealant on a finished joint is not evidence that the underlying water-shedding arrangement is correct.

Prepare the property

Keep these details on one sheet

  1. Eaves, rakes, and valleys
  2. Walls, dormers, and step flashing
  3. Chimney and masonry intersections
  4. Pipes, skylights, and curbs
  5. Existing metal reuse or reconstruction

Before authorizing work

What record belongs with “eaves, rakes, and valleys” before work begins?

Request a dated description and the evidence supporting the proposed treatment. Cross-check entries: walls, dormers, and step flashing; chimney and masonry intersections. Named responsibility: pipes, skylights, and curbs. Closeout file: existing metal reuse or reconstruction. Identity check for Roof Flashing Plan: confirm the business, applicable County license, roofing insurance, and current Harrison permit steps separately.

Bring the roof goal and written questions to the call.

Call about roof installation 877-702-1610
Call 877-702-1610